Educational guides on how workplace documents fit together — which document is typically completed before another, what is used alongside it and what follows. Connected to workplace forms, checklists and registers. Informational only — not legal advice; employers remain responsible for required documents and compliance.
What an electrical installation inspection workflow is
An electrical installation inspection workflow is the chain of documents an employer uses to keep the fixed electrical installation safe — distribution boards, circuits, sockets and fixed wiring, as distinct from portable appliances. It links the electrical risk assessment, the test register, the inspection and test record and any remedial work that follows.
This page is an educational overview of how those documents typically connect. It does not set inspection intervals or define competence — the employer is responsible for keeping the installation safe, examined by a competent person under the applicable law.
Why these documents connect
The fixed installation is not something users check, so the documents centre on competent inspection and testing at intervals. The risk assessment frames what matters; the test register records when each part was last inspected and tested; the inspection and test record captures the results; and any coded defect drives remedial work.
Connecting the documents means the installation has a traceable history and that defects found during testing are actually remedied rather than noted and forgotten.
The typical sequence
- Required before: an electrical risk assessment and a test register define what is inspected and when.
- Used with: a fixed installation inspection and test record captures the results.
- Completed after: coded defects trigger remedial work and a record of completion.
- Recurring: periodic inspection and testing run on intervals set under the applicable law.
- These are example steps only — adapt the sequence to your installation and the applicable law.
When the chain runs
The chain runs on the periodic inspection and testing intervals the employer sets for the fixed installation, informed by competent advice.
It also runs after alterations, additions, or signs of a problem such as tripping or overheating.
Who owns each step
- The employer owns the installation and ensures it is inspected and tested.
- A competent electrician or contractor carries out inspection and testing.
- A facilities lead keeps the test register and due dates current.
- A supervisor ensures remedial work is completed and recorded.
Common mistakes
- Confusing fixed installation testing with portable appliance testing.
- No register, so periodic inspection falls overdue unnoticed.
- Coded defects recorded but never remedied.
- Using someone without the competence to inspect and test.
- No clear record linking results to the part of the installation.
Records & retention (high level)
Employers generally keep the test register and inspection and test records for as long as the installation is in use and for a period afterwards, in line with their obligations and data-protection duties. A complete history supports the next inspection and any later review.
This page does not state a required period or interval — confirm both with the applicable law and the official authority.
Sharing the workflow as a PDF
Test registers and inspection and test records are commonly stored as PDFs so the installation’s history stays together and can be shared or audited. Exporting to PDF supports the record; it does not make the inspection official or guarantee compliance.
Employer notes
- Use a competent person for inspection and testing of the fixed installation.
- Keep a register so periodic inspection is not missed.
- Ensure coded defects are remedied and recorded.
- Keep installation testing separate from portable appliance testing.
Worker notes
- Report tripping, scorching, buzzing or hot fittings.
- Do not interfere with distribution boards or fixed wiring.
- Keep boards and isolators accessible and unobstructed.
- Raise any sign that the installation is not coping.
Country considerations
How fixed electrical installations are inspected, by whom and how often, and the official authority, vary by country. This page is high-level and general — it is not a statement of any country’s law and not a guarantee that a process or form is valid anywhere.
Always confirm the current requirements with the official authority for your country and a qualified professional.
Who is responsible
The employer is responsible for ensuring the fixed electrical installation is inspected and tested by a competent person and kept safe, and for compliance. This page is an educational overview with a template example; it does not set intervals, does not make a workplace compliant and does not transfer responsibility.
Export, edit and share documents
The documents, policies and templates this involves can be exported, edited, signed, stored and shared as PDFs with the HELPERG PDF Editor.
Free, printable HR & employment resources
Practical, ungated resources to put this into action — no signup.