Crane Lift Plan Workflow

A crane lift plan workflow describes how planning a crane lift fits together with the documents that control it — the ground and siting assessment, the lift plan, the exclusion arrangements and the appointed-person sign-off. This page is a simplified template example for general education; it is not an official document and not legal advice.

Educational guides on how workplace documents fit together — which document is typically completed before another, what is used alongside it and what follows. Connected to workplace forms, checklists and registers. Informational only — not legal advice; employers remain responsible for required documents and compliance.

What a crane lift plan workflow is

A crane lift plan sets out how a crane lift will be carried out safely — the crane, position, loads, radius, ground and the sequence of moves. The workflow is the chain of documents around it — the siting and ground assessment, the lift plan itself, the exclusion zones, and the sign-off by the appointed person who plans the lift.

This page is an educational overview of how those documents connect. It is not an official lift plan, is not jurisdiction-specific, and using it does not authorise any lift or guarantee compliance — the employer decides what their lifting system must contain.

Why these documents connect

  • The ground and siting assessment confirms the crane can be set up safely.
  • The lift plan sets the crane, configuration, radius, loads and sequence.
  • Exclusion zones keep people clear of the crane and suspended loads.
  • Examination records confirm the crane and accessories are fit to use.
  • The appointed person signs off the plan before the lift goes ahead.

The typical sequence

In a typical example, a risk assessment and a ground and siting assessment are completed first and are normally required before the lift; the appointed person prepares the lift plan. The crane and accessories are checked against examination records, and the plan is briefed. Any permit is issued and used with the plan.

The lift is carried out under the lift supervisor with exclusion zones in place and within the planned radius and weather limits; the lift pauses if conditions change. On completion, equipment is checked back in and a record is completed afterwards.

Who owns each step

  • The employer owns the lifting system and decides who is competent for each role.
  • An appointed person plans the lift and signs the plan.
  • A competent person assesses the ground and siting.
  • A lift supervisor controls the lift on the day.
  • The crane operator and slinger or signaller carry out the lift.

Common mistakes

  • Siting a crane on ground that has not been assessed for the loads.
  • Working beyond the planned radius or load chart.
  • No exclusion zone, so people are under or near suspended loads.
  • Continuing in wind beyond the crane’s and plan’s limits.
  • Using accessories that are not marked or examined.

Records and retention (high level)

The lift plan and assessments are generally kept with examination records and any permit, so the lift can be traced. How long they are retained depends on the employer, the work and the applicable rules.

This page does not state a required period — confirm retention with the applicable law and the official authority.

Completing and sharing as a PDF

Lift plans and assessments are commonly compiled, signed and stored as PDFs so the team works to one plan and it is kept as a record. Exporting to PDF supports the record; it does not make any document official or guarantee compliance.

Employer notes

  • Ensure lifts are planned by a competent appointed person.
  • Require a ground and siting assessment before set-up.
  • Set the roles and the weather and radius limits for the lift.
  • Keep the lift plan, assessments and examination records together.

Worker notes

  • Work to the briefed lift plan and within your role.
  • Keep people out of the exclusion zone and clear of suspended loads.
  • Stay within the planned radius, load and weather limits.
  • Stop the lift if ground, wind or visibility change beyond the plan.

Country considerations

Rules for crane lifts, siting and competence vary by country, and the official authority differs. This page is general and high-level — not a statement of any country’s law and not a guarantee of validity.

Confirm current requirements with the official authority for your country and a qualified professional.

Who is responsible

The employer is responsible for safe crane lifts, for ensuring lifts are planned and ground is assessed, and for compliance. This page is an educational overview with a template example; it does not authorise any lift and does not transfer responsibility.

Export, edit and share documents

The documents, policies and templates this involves can be exported, edited, signed, stored and shared as PDFs with the HELPERG PDF Editor.

Free, printable HR & employment resources

Practical, ungated resources to put this into action — no signup.

For general informational and educational purposes only. This is documentation guidance — not legal advice and not a substitute for professional or legal guidance. Any fields, sections or checklists shown are simplified template examples only — not official, approved or jurisdiction-specific documents. Employers remain responsible for determining which documents are required, adapting them to their organisation and the applicable law, and for compliance; using a document does not guarantee legal or regulatory compliance and reading this page does not satisfy any legal obligation. Requirements vary by role, site and country and change over time — always follow the applicable law and the official authority, and confirm specifics with a qualified professional.
Across the platform

Explore the employment knowledge graph

Move between employment law, documents, occupations, hiring guides, career guides and country guides — all one connected graph.

Knowledge graph

Employment knowledge graph

The master map of every employment cluster.

Open
Employment law

Employment law by country

How employment law works, by jurisdiction.

Open
Documents

Employment documents

Contracts, letters and forms, explained.

Open
Occupations

Occupations encyclopedia

Roles, responsibilities, skills and hiring.

Open
Hiring guides

How to hire

Employer guides to hiring each kind of worker.

Open
Career guides

Career guides

Practical, evergreen guidance for candidates.

Open
Country guides

Working in…

How work and hiring function by country.

Open
For employers

For employers

How HRHelperG works for employers.

Open
Request workers

Request workers

Tell us what workers you need.

Open
Ecosystem

Business ecosystem

Recruitment partners, including TNT agency s.r.o.

Open
Candidates

Candidate registration

Register your interest — free, no obligation.

Open
Knowledge graph

HR knowledge graph

The master topical map of the platform.

Open
HR intelligence

HR intelligence center

The master knowledge graph of every cluster.

Open
Job descriptions

Job descriptions by role

Responsibilities, skills and templates.

Open
Interview questions

Interview questions by role

Behavioural and practical questions.

Open
Hiring process

Hiring process by role

The end-to-end hiring workflow per role.

Open
Templates

HR templates

Free, printable, placeholder-based templates.

Open
HR documents

HR documents center

Document guidance and structure.

Open
Country HR

Country HR

How HR works in different countries.

Open
Staffing

Staffing & recruitment agencies

When and how to use external recruiting help.

Open
Employers

Employer services

Request hiring support and partner matching.

Open

Practical HR resources, by email

Templates, hiring insights and workforce updates. No spam — unsubscribe anytime.

FAQ

Frequently asked questions

Is this an official crane lift plan?

No. It is a simplified template example for educational purposes — not an official, approved or jurisdiction-specific plan and not legal advice. Employers must plan lifts through a competent appointed person and adapt to the applicable law.

Does following this workflow guarantee compliance?

No. It explains how the documents typically connect, but it does not guarantee legal or regulatory compliance. Compliance depends on the plan, the ground, the equipment and your obligations under the applicable law.

Why assess the ground first?

Because a crane can overturn on ground that cannot take the load. In a typical example a ground and siting assessment is completed before set-up. The employer decides the method.

Who is responsible for crane-lift safety?

The employer, who must ensure lifts are planned, ground is assessed and roles are filled by competent people. These resources support understanding; they do not transfer that responsibility.